Our serviceteam dis-assembled mooring winch from vessel during layby period. I our workshop we full overhauled the winch by fabrication new claw coupling, new bras bearing, shaft line boring. After full overhaul the mooring winch assembled back on board and tested with acceptance by class. Vessel left port of Rotterdam in time and is heading to next loading port.
Get in touch